The core difference lies in structure and capacity: the heavy-duty system adopts 100×100×8mm main tube, 28m recommended height and larger span support, designed for extreme ultra-high & ultra-large-span heavy-load projects; the conventional system adopts 80×80×6mm main tube with 24m recommended height for regular large heavy-load projects.